Case Study
Tüfentobel RopeCon®: Material is passed over to second system in mid-air for even more flexible discharge point
Since the year 2005, a RopeCon® system by Doppelmayr Transport Technology GmbH, Austria, has been transporting inert material along a long-stretched valley at the Tüfentobel landfill site, which will eventually be backfilled. The belt is being extended in several stages. It discharges the material…read more