Re: Bucket Elevator Application

Posted on 29. Aug. 2009 - 03:01
Quote Originally Posted by ansoniView Post
Dear Sir,

I request you to please tell me in which circumstances we install bucket elevator in Thermal Power Plant.

Amit

When you need to lift a bulk material vertically.

Re: Bucket Elevator Application

Posted on 30. Aug. 2009 - 12:27
Quote Originally Posted by ansoniView Post
Dear Sir,

I request you to please tell me in which circumstances we install bucket elevator in Thermal Power Plant.

Amit

======================================================

In most cases it is installed to carry the steam coal from a loading hopper outside the power plant to the stoker or stokers and dropped by graviity to the open hopper feeding the stoker- or stokers by gravity feed from above.

The bucket elevator has a diverter gate at the top of the bucket elevator to direct the flow of coal to either a pantleg bin or directly into the stoker hopper which is directly above and behind the stoker mechanism.

the ash clinker is carried away by plow or belt conveyors to a dumping hopper for disposal.

if you look at /google Riley coal stokers it will give you a good idea of the flow and elevations etc.

ansoni
(not verified)

Re: Bucket Elevator Application

Posted on 10. Sep. 2009 - 06:54

Dear lzaharis Sir,

Thank You so musch for the reply.

Amit