Lifting of Wet material (limestone+clay+Schist)

Posted in: , on 31. Dec. 2004 - 13:14

Dear friends,

I would be interested to konw if anyone has a equipment for Conveying of wet material as per propotion given below to a vertical hight of about 25 M.

The raw meal moisture is as given:

Limestone :

84 % proportion with 14-16 % moisture with 13.4 % as Average moisture, 0-100 mm particle size.

Clay

13 % proportion with 22-30 % moisture with 3.9 % as Average moisture, 120 mm particle size, max 5 %

Schist:

3 % proportion with 28-32 % moisture with 0.9% Average moisture.

Regards

Athreyan

P R Athreyan