Can we handle coal and liquid ethylene at a single jetty?
considering that while handling ethylene no coal vessel will be handled. if yes, wat are the different options available to handle liquid ethylene (other than fixed unloading arm)?
If we are providing separate terminals for both, wat will be the minimum diatane tat we can provide between the 2?
Handliing Ethylene & Coal at One Terminal?
Can we handle coal and liquid ethylene at a single jetty?
considering that while handling ethylene no coal vessel will be handled. if yes, wat are the different options available to handle liquid ethylene (other than fixed unloading arm)?
If we are providing separate terminals for both, wat will be the minimum diatane tat we can provide between the 2?
With regards
Andy ■