Hopper Modification Job Posted in: Forums » News from the Industry » New Projects, Tenders, Inquiries , on 20. May. 2014 - 17:56 We are looking for Equipment supplier /turnkey contractors for hopper modification job at Kakinada Port site. The main scope of work shall be--Numbers of hoppers to be modify--2Total numbers of Grizzly under each hopper-2 (total grizzlies-4)Cap. of each grizzly--750 tphTotal extraction from the hopper-1200-1250 tph from both the grizzlies.Size of coal lumps +200 and below---95 %Size of coal lumps +200 and above--5%(Max size of coal lumps--1200x200 mm)Moisture contents--25% max.Modification dwgs shall be provided to the contractor after finalization of grizzly suppliers.For any other requirement please call 09811055650 or mail to www.libranengineering.comThanks--Anil ■ Coal Production of Solid Fuels Solid Fuels & Energy Generation
Hopper Modification Job
We are looking for Equipment supplier /turnkey contractors for hopper modification job at Kakinada Port site. The main scope of work shall be--
Numbers of hoppers to be modify--2
Total numbers of Grizzly under each hopper-2 (total grizzlies-4)
Cap. of each grizzly--750 tph
Total extraction from the hopper-1200-1250 tph from both the grizzlies.
Size of coal lumps +200 and below---95 %
Size of coal lumps +200 and above--5%(Max size of coal lumps--1200x200 mm)
Moisture contents--25% max.
Modification dwgs shall be provided to the contractor after finalization of grizzly suppliers.
For any other requirement please call 09811055650 or mail to www.libranengineering.com
Thanks--Anil ■