Coal conveying problem Posted in: Forums » Research & Development » Flow Properties , on 28. Sep. 2008 - 17:08 Dear Sirs,We are facing problem in coal conveying to our precalciner.kindly advice to solve the problem.the following are the parameters.30 TPH coal has to pumped to pre calciner.total length of the pipe is 80 mtrDia of the pipe is 250mmnu of 90 deg bend is 4 nos.5580 cu.mtr/hr.Pressure is 0.632kg/sq.cmbefore FK pump line pressure without feed is 4000mmwcFK pump model is SM-250140X90 pitch45 kw1000rpm.but frequent blockage of the pipe line lead the kiln stoppage.kindly advice pl.regardsV.BalakrishnanSagar Cements Limited,AP.India ■ Conveying Transport Feed & Grains Coal Production of Solid Fuels Solid Fuels & Energy Generation
Coal conveying problem
Dear Sirs,
We are facing problem in coal conveying to our precalciner.kindly advice to solve the problem.the following are the parameters.
30 TPH coal has to pumped to pre calciner.
total length of the pipe is 80 mtr
Dia of the pipe is 250mm
nu of 90 deg bend is 4 nos.
5580 cu.mtr/hr.
Pressure is 0.632kg/sq.cm
before FK pump line pressure without feed is 4000mmwc
FK pump model is SM-250
140X90 pitch
45 kw
1000rpm.
but frequent blockage of the pipe line lead the kiln stoppage.
kindly advice pl.
regards
V.Balakrishnan
Sagar Cements Limited,
AP.India ■