Skip to main content
Banner Advertisement "Ultimate" by VAC-U-MAX
  • Subscribe to our Newsletter
  • Visit us on LinkedIn
  • Visit us on Twitter
  • Visit us on YouTube
  • Visit us on Facebook
  • English
  • Deutsch
  • English
  • Deutsch
  • Home
  • News
    • Markets
    • Companies
    • Projects
    • Products
    • Personal
  • Articles
    • Technical Articles
    • Case Studies
    • White Papers
    • Research Papers
  • Videos
    • Companies
    • Know-how
    • Products
    • Projects
  • Events
  • Forum
  • Who-is-Who
  • eDirectory
  • More…
    • Glossary of Terms
    • bulk solids handling Journal
  • Info
  • Search
Home

bulk-online, the Powder/Bulk Portal

  • Cookie Settings
  • Log in
  • Create new account
  • Reset your password
  • Home
  • News
    • Markets
    • Companies
    • Projects
    • Products
    • Personal
  • Articles
    • Technical Articles
    • Case Studies
    • White Papers
    • Research Papers
  • Videos
    • Companies
    • Know-how
    • Products
    • Projects
  • Events
  • Forum
  • Who-is-Who
  • eDirectory
  • More…
    • Glossary of Terms
    • bulk solids handling Journal
  • Info
  • Search
  • Company Logo - Unknown
  • Company Logo - moistech logo
  • Company Logo - bulk handling technology Canada
  • Company Logo - 9483-logo
  • Company Logo - RulmecaLogo2021
  • Company Logo - logo wamgroup
  • Company Logo - 1149-tridelta-siperm
  • Company Logo - Ohne Titel
  • Company Logo - 9068d946632ebc7643833c31e1817ff
Weekly Newsletter

Start Subscription

Banner Advertisement "Vac-U-Max rectangle" by VAC-U-MAX
New Forum Topics
more ➥
Looking for WEG ABB Nema motor supplier
Where to find high-quality and reliable manufacturer of PVC conveyor belts?
Blockage
Teus Tuinenburg
Problem in vibrating screwn
HORIZONTAL BELT CASSETTE
Top Forum Topics
more ➥
Dewatering Coal Tailings
Vibrating Screen Efficiency
Heyl & Patterson Presents Papers
Take-up and Tail Pulley Lagging
Conveyor Belt Scale Variance Testing
Emergency Stop Time
Popular Articles
more ➥
Belt Volume by Vision: Optical Measurement of Belt Conveyor Throughput
Bucket Elevator Inspection
Stresses in Silos Part 2: Stresses in Hoppers – Disturbances to the Stress Distribution
Load Stability of Bulk Cargoes during Ship Transport
Intelligent Garland – Conceptual Design and First Empirical Results
The Importance of Non-linear Strain Considerations in Belt Conveyor Indentation Loss
Popular News
more ➥
NSK Bearings lead to significant Savings at Ore Plant
FLSmidth to deliver SAG Mills, Ball Mills and Cyclones to Copper Mine in Argentina
Dinnissen Process Technology introduces Multisize Sample Carousel
Qingdao Huaxia Rubber Industry Co. Ltd. - Certificates for Mining Applications
Flexicon Tilt-down Conveyor ups Flexibility and Convenience
New standardised Ploughshare Batch Mixer series FKM LS by Lödige increases Cost Efficiency
Combustion of Solid Fuels
Article Teaser - 2024 03 14 esi  teaser
Project News

Life Time Extension of Coal Silos at Hamburger Energiewerke

Purmerend, Netherlands – Following the Life Time Extention (LTE) Program of Hamburger Energiewerke, ESI has started a renovation campaign for the two coal silos that will keep them fit for duty for another decade. The two 50.000 m3 coal silos were commissioned in 1996 and in 1998 as an innovative alternative for open stockp…read more
Article Teaser - wp 3216
Project News

BHEL wins Order for 3x800 MW Coal-Fired Power Plant in Jharkhand, India

New Delhi (Delhi), India – Bharat Heavy Electricals Limited (BHEL) has won a Rs.11,700 Crore (approx. USD 1.7 Billion) order for setting up a 3x800 MW supercritical thermal power plant in Jharkhand. The order for setting up the 3x800 MW Patratu Super Thermal Power Station Expansion, Phase-I has been placed on BHEL by Patratu…read more
Article Teaser - wp 3225
Project News

Mitsubishi Heavy Industries receives Order to build Waste-to-Energy Plant in Kawasaki, Japan

Mitsubishi Heavy Industries Environmental & Chemical Engineering Co., Ltd. (MHIEC) has received an order from Kawasaki City, Japan, to build its Tachibana Waste-to-Energy  Plant, a municipal solid waste  incineration plant in Kawasaki's Takatsu District. The order is a joint venture project with …read more
Article Teaser - wp 3355
Project News

Hitachi Zosen Inova to build the World’s largest Energy from Waste Plant in Dubai

Zurich, Switzerland – Dubai Municipality has selected Swiss clean tech company Hitachi Zosen Inova in a joint venture with Belgium’s largest construction company BESIX Group to build the world’s largest energy-from-waste facility. The plant will treat 1,825,000 tons of municipal solid waste per year.read more
Article Teaser - wp 3428
Market News

SECC: The 3rd Technology Forum for BMHE 2017 Qingdao

The third meeting of the Technology Forum for Bulk Material Handling Equipment (BMHE) was hosted by Shanghai Engineer Consultant Co., Ltd. (SECC) in Qingdao, China at the beginning of November 2017, combining with CCTASH. Participants of the conference came from end-users, including Chinese por…read more
Article Teaser - wp 3611
Product News

SWR Engineering: Exhaust Gas Cleaning in Waste Incineration – Mass Flow Measurement with SolidFlow 2.0

Schliengen, Germany – A waste incineration plant produces exhaust air during the incineration process. These exhaust gases have to be cleaned. Therefore hearth furnace coke (HFC) is transported by a screw conveyor from a silo to an injector, where it is injected pneumatically into a catalyst. Between the screw conveyor a…read more
Article Teaser - wp 3824
Product News

Martin Engineering - Powered Conveyor Belt Tracker: Continuous, Precise Adjustment

Neponset (IL), United States – A new powered conveyor belt tracker from Martin Engineering delivers immediate and continuous precision adjustment of hard-to-track reversing conveyors, helping operators reduce spillage and extend the life of belts and other system components. Able to effectively center the belt regardless of the t…read more
Banner Advertisement "Excellence" by FLSmidth & Co a.s.

Pagination

  • First page « First
  • Previous page ‹
  • Page 1
  • Current page 2
Cookie Settings | Data Protection | Terms & Conditions | Imprint | Contact Us
Copyright: ©Marcel Dröttboom Online Services
Marcel Dröttboom Online Services • Ludwig-Jahn-Str. 14 • 38678 Clausthal-Zellerfeld • Germany
Banner Advertisement "Move" by FLSmidth & Co a.s.