Replies
Re: Nitrogen And Dust Recovery
Posted on
22. Dec. 2004 - 09:25
You have to maintain the minimum conveying velocity in both lines before the two are connected into a common single line. From what you say it seems that the conveying velocity in one of the lines is below the saltation velocity. Please check if this is true.
Regards,
Amrit T. Agarwal
Consulting Engineer
Pneumatic Conveying Technologies
polypcc@aol.com
Ph and Fax: 304 346 5125 ■
Nitrogen and dust recovery
Is there general rules design about how to interconect pipes where nitrogen and dust is handling?.
My case is; nitrogen with PET dust is recovered in 2 inches pipe from the rotary valves, I decided interconect two pipes in one pipe to convey N2 and dust to a small filter bag but one line works well and the second plug.
I appreciate your help.
Fernando Gaona ■