Steel Concrete Silo

boaty
(not verified)
Posted in: , on 1. Oct. 2009 - 09:18

We are planning to build a 80T cement silo. Can anyonre add any recommendations regarding the design.

Specifics

Outlet to be a chisel style.

Pneumatic convey to fill 4".

Overfill protection unit with alarm.

Rotary valve discharge.

Slide gate flow control.

Low level indicator.

Fluidisation.

Drum Up Support To Support Drum!

Erstellt am 1. Oct. 2009 - 09:50

Have a word with your friendly local silo suppliers.

Re: Steel Concrete Silo

Erstellt am 1. Oct. 2009 - 10:10

Dear boaty,

Outlet to be a chisel style.

Why ?

Pneumatic convey to fill 4".

Depending on airflow from bulk truck.

Example: 6” pipe with an airflow of 13.5 m3/min at 1.5 bar

4" is small, reducing the unloading capacity too much.

Overfill protection unit with alarm.

Yes.

Rotary valve discharge.

Possible

Or screw discharge.

Slide gate flow control.

Possible

Low level indicator.

Possible

Fluidisation.

Yes

In addition:

-Over- and under-pressure safety valve on top of silo

-Self-cleaning dedusting filter of sufficient size in relation to bulk truck airflow.

-Manual shut-off valve directly under the cone.

-Shut off butterfly valve, pneumatically operated in case of full silo or filter failure, in the conveying pipe line.

-High level probe

-High/high level probe

-Audible and visual alarm indicator

-Control button for bulk truck operator

-Safety switches

-Lighting

-Platforms, stairways

-Work air supply

-Electric power supply

-PLC control

-Strength calculation of silo and supports, including foundation

-Paint

-Quality control

-Local Rules

Success

Teus

Teus

Cement Silo

Erstellt am 2. Oct. 2009 - 10:09

Dear Boaty,

for cement silo you only need airfluidisation for take out the cement.

If you need the components we like to work with you together. We are specialist in silo components and have lot of experience.

We recommend the pipe 4" this is correct for filling silo with silotrucks.

I dont know what will be after the silo outlett. Flat gate is correct, rotary only need if you must controll the flow for after process. But i sure is better use a screw conveyor if you must transport the material after horicontal. Than not need rotary valve.

Please contact us we can quote all you need.

www.bs-vertrieb@web.de

Best regards

Bernd Sauer

Re: Steel Concrete Silo

Erstellt am 2. Oct. 2009 - 11:06

Dear Mr Sauer,

The pipe size determines the unloading time of a standard bulk truck with an on board compressor of 15 m3/min (900 m3/hr) at 1.8 bar and a cargo of 30 tons

Assume for the 80 tons silo a horizontal distance of 5 m, a vertical distance of 15 m and 3 bends.

The 4”pipeline will unload in 45 minutes.

The 6”pipeline will unload in 22 minutes.

As the filter is sized in relation to the compressor, the filter area is the same for for both pipelines.

Have a nice day

Teus

Teus

Cement Level Controls

Erstellt am 2. Oct. 2009 - 03:37

Dear Boaty

We can help you with the level control on the cement powder as a supplier to multinational cement manufacturers. The probe operates in the air/cement phase ignoring the majority air phase and maximising the filling capability.Further details http://www.hawker-electronics.co.uk/lsmagicap

Hawker Electronics
Jindrich9
(not verified)

Offer For Silo Production

Erstellt am 5. Oct. 2009 - 11:14

Hi there,

I would like to know if you are just searching for info regarding cement silo production or are you really searching for some potential c.silo producer ?

If so, please let me know what deadline and budget you have.

Thank you.

Jindrich

Project manager

Hennlich Engineering

Czech Republic


Quote Originally Posted by boatyView Post
We are planning to build a 80T cement silo. Can anyonre add any recommendations regarding the design.

Specifics

Outlet to be a chisel style.

Pneumatic convey to fill 4".

Overfill protection unit with alarm.

Rotary valve discharge.

Slide gate flow control.

Low level indicator.

Fluidisation.

Which Country?

Erstellt am 5. Oct. 2009 - 04:44
Quote Originally Posted by boatyView Post
We are planning to build a 80T cement silo. Can anyonre add any recommendations regarding the design.

Specifics

Outlet to be a chisel style.

Pneumatic convey to fill 4".

Overfill protection unit with alarm.

Rotary valve discharge.

Slide gate flow control.

Low level indicator.

Fluidisation.

Hi Boaty,

in which country you will realize your cement silo??

boaty
(not verified)

Re: Steel Concrete Silo

Erstellt am 5. Oct. 2009 - 10:42

We are situated in Queensland, Australia.

80 T Cement Silo

Erstellt am 6. Oct. 2009 - 06:10

Dear Mr. Boaty

We would be more than pleased to support you in your cement silo planning. Our company has more than 40 year experience in the cement industry and specially silo design. As we are designer we are independent of any machine supplier and can therefore design for you the most convenient solution to your needs.

Please notice that silo civil design is depending strongly on the equipment for outlet and inlet. Just to mention the additional loads due to flow channel load case according to new building codes (e.g. DIN1055, Eurocode EC1) causing lot’s of silo damages over the world.

We deal with cement silo issues from the mechanical and civil point of you.

Please have a look at our homepage.

http://www.scherr-klimke.de

Or contact me anytime per email or phone given below.

Some of our cement references are given in attachment.

Dr. Tarek Nasr

Team Leader

Scherr+Klimke AG

Eberhardtstr. 58

Ulm/Donau

Germany

Fax: + 49 7 31 92 25 200

Tel.: + 49 7 31 92 25 158

t.nasr@scherr-klimke.de

WWW: http://www.scherr-klimke.de

Attachments

scherr-klimke-reference-list-cement-industry-eng (PDF)

scherr-klimke-reference-projects-cement-eng (PDF)

01850-scherr-klimke-cement-eng (PDF)

scherr-klimke-planned-in-germany-eng-vbi (PDF)

80t Silo

Erstellt am 12. Oct. 2009 - 04:19

Dear Mr Boatey,

CST would be able to assist you with this and you can send the enquiry to me in our Singapore office - sscott@tanks.com

We have a number of outlets in Australia that would be able to offer a full supply and build package, or we could supply on a DDU basis for self-build.

Our web page is : http://www.tanks.com

I look forward to receiving the details.

Kind regards

Simon Scott

+65 9069 0340

Cement Silos

Erstellt am 16. Oct. 2009 - 09:01

We can supply you with design and silo for your project. Please complete the attached data sheet and provide any additional details, drawings, etc and we will work on this for you.

Scott Dahlgren

CMT Inc

www.cmtnc.com

704-846-3737

Attachments

silos (PDF)