One of our clients needs to sign long term agreement with coal mine owners/shippers in Indonesia.The requirement is 5 mtpa of coal for 500 mw plant, the agreement shall be for 15-20 years.The mine owner should have own fleet of Ships to fullfill this requirement.The unloading of coal shall be near Chennai where the draft limit is 10 m.
Coal Import from Indonesia
One of our clients needs to sign long term agreement with coal mine owners/shippers in Indonesia.The requirement is 5 mtpa of coal for 500 mw plant, the agreement shall be for 15-20 years.The mine owner should have own fleet of Ships to fullfill this requirement.The unloading of coal shall be near Chennai where the draft limit is 10 m.
Anil
www.libranengineering.com
0091-9811055650 ■