Wet Concrete handling system from Batching plant to DAM construction

Posted in: , on 11. Dec. 2007 - 08:29

We are planning to design a conventional portable conveyor system to handle the wet concrete from Batching plant to the DAM elevated at 40m height.

The capacity of the system is 400 to 450 TPH

Please advise the design parameters of the conveyor system, Supplier details along with reference projects/Photos.

Thanks

Grandhe

Write the first Reply