Replies
Re: Stacking Blending Reclaiming - B/2000
Posted on
22. Dec. 2000 - 11:23
Posted on May 31, 2000 at 11:30:56:
In Reply to: Stacking Blending Reclaiming - B/2000 posted by Reinhard H. Wohlbier on December 06, 1999 at 13:23:48:
I would like lo learn more about this subject
B. Boreman
Design Features Optimize Life of Rotary Car Dumpers ■
Re: Stacking Blending Reclaiming - B/2000
Posted on
22. Dec. 2000 - 11:23
Posted on October 30, 2000 at 05:37:17:
In Reply to: Re: Stacking Blending Reclaiming - B/2000 posted by Gilles Couture on May 31, 2000 at 11:30:56:
I would like to know if the book B/2000 Stacking Blending Reclaiming had been published and in positive case what have I do to get one.
Regards,
Ailton M. Bastos ■
Untitled
Posted on December 06, 1999 at 13:23:48:
In February 2000 we will publish the book
B/2000 Stacking Blending Reclaiming
within the third generation
"Series on powder & bulk solids
handling & processing".
B/2000 Stacking Blending Reclaiming
February 2000, about 216 pages, US$ 50.00,
SFR 75.00, DM 90,00. Mailing charges upon request.
Order address: avm@ttp.net.
Please ask for Proforma Invoice and
specify mode of shipment:
surface mail
airmail
special courier.
Tentative Contents:
J.W. Carson, R.T.Jenkyn and J.C. Sowizal
Reliable and Economical Handling of Bulk Solids
at Coal-Fired Power Plants
C.M. Ramos
The Real Costs of Coal Degradation
R. Kollmer and H. Langerak
Throughput Increase Due to Variable Speed by
Hydraulic Drives
E. De Capitani and A. Tura
Bandar Iman Khomeini Iron Ore Receiving Terminal
Q. Peitao
Coal Terminal and Handling Mechanization in China
M. Lindsay-Scott and W. Rossle
Blue Circle Cement’s Kaalfontein Depot
M.M. Vermeule
Renewing Raw Material Handling in the CEMIJ Plant
H. Hansen
Screening of Damp, Dirty Raw Materials
in the Cement Industry
A.S. Bardos
Coal Handling Plant of the New Belledune Power Station
S.R. Shehata and H.M. Wilton-Clark
World’s Largest Circular Reclaim System
at Belledune Power Station
S.K. Chakraborti
Lessons Learned from Handling Western Coal
at American Electric Power’s Rockport Plant
R. Weidenbach and F. Wolpers
Coal Handling at Badenwerk Power Station
G. Michaeli
Coaling Plant for Duesseldorf Power Station
J. Gateley
Pennine Stockpiling and Undermining
K.R. Alexander
Flux Vector Drive Applications
for Bulk Material Handling Equipment
H.M. Haydl
Conical Storage Halls
J.R. Sturgul and S.R. Thurgood
Simulation Model for Materials Handling System
for Surface Coal Mine
R. Francis, L. Pedersen and J. Troncoso
Design and Construction of Coal Handling Facilities
at Gordstone Colliery
R. Reiter and P. Wagner
Raw and Product Coal Stockpiling Machines
at Gordstone Colliery
K. Brown, J. Carmody, P. Hughes and A. Swanson
CHEQS - Real Time Quality Management
for Newcastle Coal Exports
F.-G. Ostrop
Coal Quality Control for Consumers
Along the North-South Railway Line
N. de Wet
Homogenizing/Blending in South Africa -
An Update
M. Bessner, B. Galle and M.Sagheer
High Flexibility for Reliable Coal Supply
of a Power Plant
P. Pongpirodom
On-Line Analysis for Coal Blending
at Mae Moh Mine, Thailand
A. Chattopadhyay, M.A. Parameswaran and K.R. Rao
Development of a Database System on Bulk Solids -
A Relational Model Approach
G.F. Fabani, E.G. Pacheo, C.F. Perucca and J.R. Solis
Storing and Transportation of Potassium Chloride -
A Proposal
L. Mayer
Sleepers Supported Rail Tracks for Stacker-Reclaimers
M. Clampin and H. Wright
Improving the Free Flow Capability
of Power Station Coal Bunkers
S.K. Chakraborti
American Electric Power’s Coal Pile Management Program
A. Fretwell
Coal Handling System Improvement
at Lamma Power Station
T.D. Banerjee and G. Paes
Simulation Model for a Raw Material Unloading System
in a Steel Plant
D.S. Heindel and P. Leybourn
Coal Operations Resources Engineering System –
A Power Station Coal Handling Control System Upgrade
A.W. Gerstel and J.W. Werner
Computer Simulation Program for Blending Piles
Ib Finn Petersen
Raw Material Feeding Systems
J.B.A. Meijer and M.J. Redmond
Giving Stockyard Machines a New Lease of Life
F.J. Cabrejos and D.J. Goodwill
Tunnel Reclaim from Ore Stockpiles
J. Gateley
FAIRO Stockyard Vehicles for Maximum
Storage Capacity on Stockyard Site
J. Harder
Dry Ash Handling System
for Advanced Coal-Fired Boilers
V. Quattrucci
Dry Bottom Ash Extraction –
Environmental Safeguard and Economic Savings
Given by the MAC-System
A.W. Gerstel and S.M. van Seters
New Developments in the Homogenisation
of Raw Material on a Large Scale
N. Ahrens
Latest Developments in Circular Mix Bed Technology
M. Scher
Handling of Coal and Ash at
Israel Electric Power Stations
S. Engle and W.W. Salmon
Undetected Corrosion and Wear Cause
Stacker Reclaimer Boom Tip Failure
B. Boreman